 |
 |
30 years to first
maintenance offers
best ‘whole life’
solution. |
 |
 |
 |
 |
|
Greater service life
reduces traffic
disruption and losses
to economy. |
 |
 |
 |
 |
|
Up to 10,000m 2
surfacing output per
day. |
 |
 |
 |
 |
|
Traditionally applied
at 50 to 80mm thick,
can reduce dead-
load on structure by
between 40 & 60%. |
 |
 |
 |
 |
|
High flow attributes
without compacting
ensures voids at
interface with the
waterproofing are
minimised. |
|
|
 |
 |
Machine laying
provides excellent
ride quality whilst
dramatically reducing
strucural dead loads. |
 |
 |
 |
 |
|
Can be up to 2 Db
quieter than SMA and
5 Db quieter than
HRA. |
 |
 |
 |
 |
|
Laying width of up to
14.2m offers joint
free or reduced joint
finishes requiring
mainenance. |
 |
 |
 |
 |
|
Less than 1% void
content practically
eliminates water
within the asphalt. |
 |
 |
 |
 |
|
Material is self-
compacting avoiding
use of compaction
plant and rutting in
poorly compacted
asphalt. |
|